Coordinated Network Development Plan

As the market area manager, AGGM is fulfilling the obligation stipulated in section 14 (1) (7) GWG, and prepares a Coordinated Network Development Plan (CNDP) every year for a 10-year planning period in coordination with the Austrian transmission system operators and taking into account the long-term planning. It is published upon approval.

The aims of the coordinated network development plan (CNDP) are specifically

  • meeting the demand for line capacity to supply consumers while considering emergency scenarios 
  • ensuring a high degree of availability of line capacity (security of supply of the infrastructure) 
  • covering transport needs 
  • complying with the obligation to meet the infrastructure standard according to Article 6 Regulation (EU) No 994/2010 in the market area.

 

2018 Coordinated Network Development Plan

Data Acquisition
Nonbinding capacity demand requests by market participants and announcement of projects by adjacent system operators can be continuously reported to the transmission system operators Gas Connect Austria GmbH and Trans Austria Gasleitung GmbH.
Capacity demand requests, which are stated before the 4th of July 2018, are taken into account in the 2018 Coordinated Network Development Plan.

Planning
Based on the gathered data, the capacity scenario agreed with E-Control Austria will be created. During the planning phase, projects that meet the requested capacity demand will be developed.
The results of the 2018 Coordinated Network Development Plan will be presented to the market at the Austrian Gas Infrastructure Development Day (AGIDD) on the 16th of October 2018 in Vienna.

Consultation
The consultation of the 2018 Coordinated Network Development Plan will take place from the 17th of October 2018 until the 9th of November 2018. The documents of the consultation will be published on the AGGM homepage.

Permit
It is planned that E-Control Austria will approve the 2018 Coordinated Network Development Plan by notice at the end of December 2018.

 

2017 Coordinated Network Development Plan

E-Control Austria approved the 2017 coordinated network development plan on 19 January 2018 by notice.


The consultation of the 2017 coordinated network development plan took place between 6.9.2017 12:00 and 3.10.2017 12:00. The consultation version and the opinions are published below:

The results of the 2017 coordinated network development were presented to the market participants on 5 September 2017 as part of the Austrian Gas Infrastructure Development Day.

 

2014 – 2016 Coordinated Network Development Plan

The Coordinated Network Development Plans of the past periods, including the decision of Energie-Control Austria, as well as the presentations of the Stakeholder Joint Working Sessions (SJWS) and the opinions on the respective consultation version, are listed in the following table.

 

Approved Coordinated Network Development Plans

Stakeholder Joint Working Sessions

Consultation Versions & Statements

KNEP 2016

Koordinierter Netzentwicklungsplan 2017 – 2026 (PDF, 4019 KB)
(Per Bescheid am 23. September 2016 genehmigt)

MGM_KNEP_SJWS_DE
GCA_NEP_SJWS_DE
TAG_NEP_SJWS_DE
ECA_SJWS

Consultation:
Koordinierter Netzentwicklungsplan 2017 – 2026

Statement:
UNIPER
UNIPER
AGGM
EUSTREAM

KNEP 2015

Koordinierter Netzentwicklungsplan 2016_2025
Ergänzung 1 zum KNEP 2015_Ersatzinvestitionen
Ergänzung 2 zum KNEP 2015_Ersatzinvestitionen
(Per Bescheid am 27. Oktober 2015 genehmigt)

MAM_KNEP_SJWS_DE
GCA_NEP_SJWS_DE
TAG_NEP_SJWS_DE
ECA_SJWS_DE
OGE_SJWS_DE
BNetzA_SJWS_DE

Consultation:
Koordinierter Netzentwicklungsplan 2016 – 2025.pdf

Statement:
Stellungnahme der Eon Gas Storage
Stellungnahme der bayernets
Stellungnahme des Landwirtschaftskammer Österreich

KNEP 2014

Koordinierter Netzentwicklungsplan 2015_2024
(Per Bescheid am 02. Dezember 2014 genehmigt)

MAM_KNEP_SJWS_DE
GCA_NEP_SJWS_DE
BOG_NEP_SJWS_DE
TAG_NEP_SJWS_DE
Zusammenfassung SJWS

Consultation:
Koordinierter Netzentwicklungsplan 2015 - 2024 (Konsultationsversion)

Statement:
Stellungnahme der EGS
Stellungnahme der Pozagaz
Stellungnahme des BMLFUW