Gas shipmentsin the distribution area

If you plan to ship gas in the Eastern distribution area please watch out for the following points:

  • Capacity reservations must be submitted to the distribution area manager for all schedule notifications at the cross-border interconnection points in the distribution area. However, balance group representatives do not require capacity allocations for supplies to consumers, or injections to/withdrawals from interconnection points for shipments to/from storage facilities or from production systems.
    Your contact at AGGM for queries about this is Sabina Glasner:
    Tel. +43 (1) 27 560-28875 oder email:  sabina.glasner@aggm.at.
  • Initial schedule notifications should be sent to the distribution area manager at least five days in advance to enable schedule configuration issues to be dealt with in good time. Please consult Chapters 2 and 3 of the Gas Market Code for more information on this topic.
    Your contact at AGGM for queries about this is Othmar Hofmeister:
    Tel.+43 (1) 27 560-28855 or email:  othmar.hofmeister@aggm.at.
  • The Erdgas-Energielenkungsdatenverordnung (Natural Gas Energy Intervention Data Order) requires BGRs to transfer the information specified by sections 2a, 4, 4a and 5 to the distribution area manager.
    Your contact at AGGM for queries about this is Franz Haberl:
    Tel. +43 (1) 27 560-28856 or email:  franz.haberl@aggm.at.